Welcome to Dalian Tongda Mining & Metallurgical Machinery Co., Ltd.
TEL:0411-87362498 / 87361024 / 87350608
Fushun New Steel Unloading Truck Test Run Successfully
Release time:
2023-07-05 00:00
Recently, our company signed a contract with Fushun New Steel Co., Ltd. for a set of unloading trucks for the "Fushun New Steel Ironmaking Plant New Environmental Material Yard Project". The on-site assembly has been basically completed and is currently undergoing debugging and testing.
The material stacking capacity of this project is 1500t/h, with a main belt width of 1400mm, powered by sliding contact wire, and a running length of 200m. The machine is equipped with double-sided sealing belts and a single machine for dust removal. The unloading truck adopts three selection control methods: remote automatic, on-site manual, or on-site semi-automatic, and completes unloading at different unloading points through the driving wheel. To improve the efficiency of equipment, save labor costs, improve the working environment for drivers, and enhance the level of unloading intelligence.
Wishing the unloading truck a smooth and efficient trial operation.


